High load sewage treatment plant solution


Higher load sewage treatment plants.

 

 

The AB process was first developed by Professor B0HUKE from Germany. This process divides the aeration tank into two stages: high and low load, each with independent sedimentation and sludge reflux systems. The residence time of high load section A is about 20-40 minutes, mainly due to biological flocculation and adsorption, while incomplete oxidation reactions occur. The organisms are mainly short generation bacterial communities, and BOD removal reaches over 50%. Section B is similar to conventional activated sludge, with lower load and longer sludge age.

 

 

Service

Jinxinsheng(Beijing) Environmental Protection Technology Co.,Ltd

E-mai: info@jept.com.cn
Hotline: +8610 64021466

Address: Rm.B301A, Building 1, Jiao Ao Center, No. 59 Huagong Rd., Chaoyang Dist., Beijing, China